Home > Products > Construction & Decoration > Other Construction Materials

TD-10 Rail Spike Anchoring Agent\ Mortar 1
  • TD-10 Rail Spike Anchoring Agent\ Mortar 1

TD-10 Rail Spike Anchoring Agent\ Mortar

Model:-
Brand:-
Origin:Made In China
Category:Construction & Decoration / Other Construction Materials
Label:high value grouting , for reinforcement , grouting material
Price: -
Min. Order:50000 pc
Inquire Now Add to Basket

Member Information

Detail

Huaqian Special Products Co., Ltd

Free MemberBeijing - China
Live Chat:Last Online:03 Mar, 2011

Product Description

Description:
The product is inorganic mixture, fast harden\ High intensity \ micro-expansion, Environment-friendly. do not need to warm up in normal condition (20\68 \ 70 % Humidity). Mixed with water is available. Avoid crack due to partial warmed, which reduce the working time of rail spike. Constriction at -10\ 14 is available. Well performance after 2 million times destructive test 
Applications:
1, It can be used in railway: rail spike anchoring of the concrete railroad crosstie \ crosstie of bridge. It can be used in anchoring of installed bridge bonded joined and the foundation bolt of instrument.
2, It can be used in railway\ tunnel \ channel \ coal mine \ Strengthen of bridge pier \ anti-crack of house \ Metallurgic mine etc. fast construction for anchorage of underground construction with anchoring component. In order prevent stone drop.
3.It can be used in the Strengthen of the concrete construction with reinforcing steel bar. And satisfy the weld of the reinforcing steel bar.
Specifications: 
Vertical Expansion Rate (%)
Rail spike pull-out resistanceKN
4 hours
1 day
3 days
≥0.02
20
35
50
60
Standard : TB/T2093-2002
How to Use
No.
Steps
Tools
Requirements of Construction
Remarks
1
Take out the old rail spike
special tools
1. take out the old spike
2. Cleaning the hole of the rail spike.
2
stick
 
3
Mixing
Add or reduce water according to situation 
4
Grouting
spoon
Grouting the mixed anchoring agent into the hole from the middle of the shelf of anchorage. 2cm to the top of the hole it’s better.
 
Put the rail spike
 
Make sure no oil stain on the spike
6
clean up
Stick
7
Fix the fastener
T- spanner
After anchoring (60 min), fix the fastener, screw down the nut with hand, after 120 min screw down the nut with T-spanner, 24hour screw down tightly as required  
 
8
Change the new railroad
 
It will be available after 1 day curing.
It’s better to spray water after 1-3 days curing
Notices: dosage of each rail spike ±0.4 kg
 Attentions:
1.       The mixed material should be used up within 30 min, mixing time 2-5 min. 
2.       Add or reduce water according to situation to enjoy best flow-ability.
3.  If the temperature at -10-0\ 14-32, mixing the anchoring agent with 40-50 \ 104-122 water. Cover the necessary insulating-compound in order to prevent frostbite. 
 

Payment Terms:within 7-15days after payment

Product Image

TD-10 Rail Spike Anchoring Agent\ Mortar 1
Img 1

Send Inquiry to this Member

Huaqian Special Products Co., Ltd

No:323.zhuxinzhuang.huilongguan town changping diatrict.beijing China

Phone:
0086-010-80770162
Fax:
Contact:
yang bo (manager)
Mobile:
80770162

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Other Construction Materials Made In China Products

,  

Other Construction Materials China Suppliers and China Manufacturers