Home > Products > Metallurgy , Mining & Energy > Energy > Bitumen

Go Green Pourable Crack Filler 1Go Green Pourable Crack Filler 2Go Green Pourable Crack Filler 3Go Green Pourable Crack Filler 4
  • Go Green Pourable Crack Filler 1
  • Go Green Pourable Crack Filler 2
  • Go Green Pourable Crack Filler 3
  • Go Green Pourable Crack Filler 4

Go Green Pourable Crack Filler

Model:-
Brand:-
Origin:-
Category:Metallurgy , Mining & Energy / Energy / Bitumen
Label:crack filler , road maintenance
Price: -
Min. Order:-
Inquire Now Add to Basket

Member Information

Detail

Go Green Industrial (Shanghai) Co., Ltd

Free MemberShang Hai - China
Live Chat:Last Online:15 Apr, 2020

Product Description

Go Green Pourable Asphalt Crack Filler is a safe, easy-to-use, modified asphalt emulsion crack filler designed for maintenance of asphalt and concrete pavements. It prevents cracks from becoming potholes by sealing them from the weather’s destructive freeze and thaw cycles.

Features:

  • Flexible to allow for expansion and movement
  • Ideal for cracks up to 1.27cm wide
  • Cracks 3cm–5cm can be filled by mixing Go Green Asphalt Crack Filler with sand
  • Long lasting protection against ingress of water
  • Suitable for inside and out
  • Excellent adhesion

Go Green cold pourable crack filler contains a ductile asphalt combined with compatible components that require no modifications or heat to apply. A preservative is added. Keep this product from freezing.

User Guide
in asphalt can lead to water ingress, erosion and accelerated deterioration of the surface. This rubberised bitumen based product makes crack repairs easy. Simply decant the liquid into a watering can (or any spouted can) and pour into the crack. Usage depends upon crack size, 1kg crack filler can repair 5~15m cracks.
             
Notice:
1、Just clean crack, shake, snip open and squeeze into crack. cracks should stay no water, dirt, dust, grease and other contaminants.
2、It will be no rain, no snow, the effect of the permeability depending on weather, should be fully dry within 24 hours and ready to seal over.
3、Pour crack filler slowly into crack and Squeegee excess filler into crack..
4、It shall not be less than 0 ℃ temperature when storing, transport. Storage period of 6 months

It is ideal for roads, highways, parking lots, and driveways. When properly applied, Go Green cold pourable crack filler can be driven over within 30 minutes without tracking.


Product Image

Go Green Pourable Crack Filler 1
Img 1
Go Green Pourable Crack Filler 2
Img 2
Go Green Pourable Crack Filler 3
Img 3
Go Green Pourable Crack Filler 4
Img 4

Send Inquiry to this Member

Go Green Industrial (Shanghai) Co., Ltd

808,YongYe Building, No.2240 South Pudong Road. Pu Dong New District, Shanghai, P.R.China.

Phone:
86-21-61053027
Fax:
86-21-61009307
Contact:
Paris Lau (sales)
Mobile:
15900640746

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Bitumen Made In China Products

,  

Bitumen China Suppliers and China Manufacturers