Home > Products > Industrial Supplies > Machine Hardware > Mold

Plastic mould manufacture 1
  • Plastic mould manufacture 1

Plastic mould manufacture

Model:14
Brand:NEOK
Origin:Made In China
Category:Industrial Supplies / Machine Hardware / Mold
Label:PLASTIC MOULD , TOOLS , MOULD MANUFACTURE
Price: US $3000 / pc
Min. Order:1 pc
Inquire Now Add to Basket

Member Information

Detail

NEOK TECHNOLOGY LIMITED COMPANY

Free MemberGuang Dong - China
Live Chat:点击这里给我发消息Last Online:27 Oct, 2021

Product Description

SPECIFICATION
Usage Automotive
Mold type Thermoplastic hot runner injection mold
Raw material PC+ABS
Finishing Technical Polishing
Cavity No 1+1 mirrored
Construction 2-plate
Demold mechanism Slider x 4
Injection Hot runner system with mainfold x 2 nozzels, brand Mold-Master
Mold material 1.2344 ESU, 58-62 HRC
Mold size L800xW400xH450mm, LKM moldbase
Components HASCO ejection pin, waterline plugs & connectors,
Machine Tonnage Haitian 280T
Cycle time 32 sec
Mold lifetime 1,000,000 shots
FA leadtime 4 weeks
Delivery time 10 weeks

The Automotive thermoplastic injection mold with hot runner system , which design period is 2 weeks at moldlife time 1 milliom. mold steel is 1.2344 ESU hardened, 48-52HRC, mold base 1.1730 steel. it is very fast in 3D mold designing against professional mold engineering designer.cycle time normal 32 sec., but 28 sec. is also can be catched up with.

At Project management, exclusive project engineer reviewed mold 3D & 2D mold design for details before he submit mold moldes to client's mold engineer. Afer only one version DFM communication (4 days), it took 6 days  to design 2D general drawing & 3D model.

Special concerns to demold mechanism of slider, mold core in hardness 52 HRC,  slider in 48 HRC, wear plate of wedge in 52 HRC. slider fitting tolerance 0.01~0.02mm in sliding movement.

On T1 frist mold trial ,cycle time is 43 sec. beyond moldflow analysis report value. but after project engineering team reviewed T1 condition, new cycle time closed to 33 sec. in  Haitian 280T press. the samples in automatic-falling without deformation during 100 cycles.

Test samples off mold were sent to client by DHL express with good package in carton box , 3 days arriving at destination.

Final kick-off running before mold delivery, 5 hours continuous cycle molding without broken to assure molding mechanism steable in mass production at customer's plant.


Payment Terms:T/T

Product Image

Plastic mould manufacture 1
Img 1

Send Inquiry to this Member

NEOK TECHNOLOGY LIMITED COMPANY

T Bdg B,#2 Shanglang Rd, Xiabian Area, Chang'An ,Dongguan,523876 China

Phone:
86-0769-81152701
Fax:
86-0769-81152701
Contact:
jane zeng (Business Manager)
Mobile:
13500095011

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Mold Made In China Products

,  

Mold China Suppliers and China Manufacturers