Home > Products > Industrial Supplies > Other Industrial Supplies

Fructose production line 1Fructose production line 2Fructose production line 3
  • Fructose production line 1
  • Fructose production line 2
  • Fructose production line 3

Fructose production line

Model:DY75
Brand:DOING
Origin:Made In China
Category:Industrial Supplies / Other Industrial Supplies
Label:fructose production , fructose machine , fructose equipment
Price: US $280000 / set
Min. Order:1 set
Inquire Now Add to Basket

Member Information

Detail

Henan Doing Mechanical Equipment Co., Ltd

Free MemberHe Nan - China
Live Chat:Last Online:15 May, 2018

Product Description

Doing Company has a professional starch syrup technical team, can provide customers with maltose syrup, fructose syrup, glucose syrup production technology and engineering design, has the first-class project management team, can provide comprehensive solutions in the field of Fructose production line.

Following is the Fructose production line introduction:
1. Raw material check and feed:
The raw material(rice, corn or starch) requests starch content more than 80%, water content less than 14%, there is no mildew in the raw grain, send them to conveyor.

2. Temporary storage:
Let the raw grain or starch lift into the steel plate with the hoist for temporary storage.

3. Cleaning, desanding and powder milling:
Make the raw grain lift to cleaning sieve and desanding machine, remove the impurity, and ground into fine powder by Doing Company grinding mill. Its particle size is less than 60 mesh.

4. Fructose production line mixing and liquefaction process:
Mixing the rice flour,corn flour or starch with water, adjust the concentration to 18Be, PH value to 5.6-6.0. After the α-enzyme which is high temperature resistance adding, deliver to jet liquefier with steam heating up to 100-108℃ to be liquefied.

5. Protein filtration:
The liquid hydrolysis qualified dextrin solution (DE value about 20) is sent to the plate frame filter for protein separation and filtration, the separated proteins were washed and dried and crushed, and then packed into the warehouse after inspection. This increase the add-value of glucose syrup production plant.

6. Saccharification process of Fructose production line:
Conveyor the liquid to saccharifying tank, adjust the temperature to 60℃, PH value about 4.2-4.8, add some saccharifying enzyme, keep 36-50 hours.

7. First decoloring:
DE value reached more than 97 of the saccharification liquid after heating to 75℃ enzyme treatment, adding activated carbon, adsorption processing 0.5 ~ 1 hour later, send into plate and frame filter press to removing carbon and decoloring, then the transmittance of the solutions should more than 75%.

8. Ion exchange in the Fructose production line:  
When the solutions is cooled to about 40~45℃, it is sent to the ion exchange column for ion exchange treatment. The conductivity of the solutions is less than 20ppm.

9. pre-evaporation:
Preconcentration of the syrup solutions after ion exchange to 45Bx.

10. Isomerism:
Add magnesium sulfate and sodium pyrosulfite to 45Bx syrup solution, after the PH value adjust to 7.5-8.0, send to isomerism column, Adjust the feed flow of the heterogeneous column, so that the content of the export fructose is about 42~44.

11. Second decoloring:
Add activated carbon to material when its after isomerism, after adsorption treatment for 0.5~1 hour, the filter was sent to remove carbon and decolorization, and the transmittance of the solution was reached to 95%.

12. Second ion exchange:
Cooling the solution to 30-35℃, then deliver to ion exchange system, this time the conductivity of the solutions is more than 95%.

13: F42 high fructose syrup evaporation:
The solution is concentrated to 71Bx after the second separation, which is the finished product of F42 high fructose syrup. In addition, the part is condensed to 60Bx and sent to chromatographic separation.

14. Chromatographic separation:
The fructose syrup is separated by the separation tower, glucose and fructose are separated, the glucose is sent back to pre-evaporation, and the fructose is sent to the next step after being mixed with the 42 fructose syrup from the secondary separation to 55.

15. Mixed bed process of Fructose production line:
Mixed the F55 fructose syrup into the mixing bed, the transmittance of the solution is more than 97%, and the conductivity is less than 15ppm.

16. Evaporation process:
The F55 fructose corn syrup after the mixed bed is condensed to 77.5Bx, which is the finished product of F55 fructose syrup.

17. Storage and filling:
The F42 and F55 high fructose syrup is sent to the finished tank for storage, and when necessary, it is pumped into the filling tank and loaded into the packaging container.

 

Inquiry: http://services.doinggroup.com.cn/kf.php?mod=client&cid=doingequipment&wid=23
Click here to give you the best price

Welcome to make an inquiry of our machine by following contacts:
Contact: Ms Elina
Email: sales@doingmachinery.com                                            
Tel: 0086 371 5677 1822                                                 
Whatsapp/Phone:0086 135 2661 5783                                                   
View more:
http://www.syrupmachine.com
http://www.starchprojectsolution.com


Product Image

Fructose production line 1
Img 1
Fructose production line 2
Img 2
Fructose production line 3
Img 3

Send Inquiry to this Member

Henan Doing Mechanical Equipment Co., Ltd

Room 1408, 14th Floor, Building 9, No.133 Yaozhai Road, Jinshui District, Zhengzhou City, Henan Province, China. sales@doingmachinery.com

Phone:
00-86-13526615783
Fax:
Contact:
Elina (sale manager)
Mobile:
56771822

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Other Industrial Supplies Made In China Products

,  

Other Industrial Supplies China Suppliers and China Manufacturers