Model: | CHENJI-M |
---|---|
Brand: | CHENJI BEER EQUIPMENT |
Origin: | - |
Category: | Agriculture & Foods / Beverages / Alcohol |
Label: | BEER EQUIPMENT , BREWERY EQUIPMENT , brew tanks |
Price: |
US $50000
/ pc
|
Min. Order: | 1 pc |
Live Chat: | Last Online:04 Aug, 2017 |
300L 500L 800L 1000L beer equipment
Product classification: Brewing beer equipment
Applications area: Beer Bars, Hotels, Restaurants etc.
Product features:
Description:
CE/PED certificated 100l 300l 500l micro beer brewing equipment |
|
||
No |
Item |
Technical specification |
|
1 |
Malt miller |
Double roller miller |
|
2 |
Mash/lauter tank |
Top stainless steel manhole with sight glass
|
|
kettle/whirlpool tank |
Equipped with agitator, the brand of motor is ABB Tangential whirlpool inlet |
||
3 |
Hot water tank |
Out liquid level tube,
|
|
4 |
Plate heat exchanger |
Heat exchanger plate: Alfa Laval Design Structure: Suspension type, screw material is SUS304, nut material is brass, very easy disassembled for cleaning. |
|
5 |
Fermentation tank |
Side manhole, shadowless manhole Stringent tank leakage test by water and pressured gas Stringent jacket leakage test by pressured gas |
|
6 |
Bright beer tank |
Mechanical pressure valve; Pressure gauge
|
|
7 |
Yeast adding tank |
outside sand blast, associated valves and fittings |
|
8 |
Glycol water tank |
PT100 Temperature sensor for high accuracy temperature control Insulated conical top and sloped bottom |
|
9 |
Chiller |
World-famous brand Coolsoon |
|
10 |
CIP cleaning system |
1. Sanitizer Tank
|
|
11 |
Control system |
PID/PLC |
|
About Us:
Our Beer Brewing Equipment is carefully manufactured and tailored specifically to each of
our customers’ needs. We offer a wide array of Beer Brewing Equipment that will accommodate
any budget or production goal that each customer might have. For any specific information regarding our Beer Brewing Equipment, please contact one of our representatives and we will be more than happy to help you.
Application:
The whole set equipment is made of austenitic stainless steel.The cooling jacket adopts dimple jacket. The jackets are provided at tank body and conical bottom to effectively increase the cooling speed. Heat exchanging area of jacket of different proportions can be allocated according to customers' technological requirements. Widly used in brewery,bar, hotel,family etc.
The advantages of our equipments:
1. Roughness is less than 0.22μm
2. Without any dead corner
3. Discharge with rotation
4. Multi-stage cooling jacket can save more energy
5. Various heating methods (electric heating, gas heating, steam heating)
6. Filter plate (unique design with back taper)
7. Churn (manual, semi-automatic, top stirrer and bottom stirrer)
8. We have sufficient spot goods, conventional criteria beer equipment and we can deliver the goods within 3 days after signing the contract and remittance.
9. Our equipment is mainly used in brewing of beer, stout and rum. Besides, the product made by our equipment is tasty and fragrant.
Beer Brewing Process
1) Crushing and saccharification
Grind the malt to pieces not powder.Cook wort with the brewhouse by some different temperature processes.
2) Filter:
Pump the wort after mashing to fermenter, separate the wort and spent grains, till wort is clear.
3) Boiling and adding hop
Transfer clear wort to brewhouse, add water to 50L, boiling it to 100 degrees & (add hop) last
50 minutes.
4) Cooling
Cold down the wort by opening the water jacket tap of brewhouse. Transport wort to the
fermenter when its temperature is about 8degree.
5) Fermentation
After adequate cooled wort into the fermenter, adding 5liters liquid yeast or 50g dry yeast into
fermenter. Fermenting process takes about eight days. In this process, sugar in the malt will be
fermenting into alcohol.
6) Slaking and storage
Beer maturation takes about three weeks of storage. This process will be finish on 0 ° C for beer
color rendering, unique flavor development in this step too.
Our service:
Pre-sales Service:
1)Help the clients to confirm the configuration list
2)Supplying different beer craft specification
3)Designing the drawing according to the client’s floor plan and your requirement
4)Showing the detailed diagram of the tanks
After-sales Service:
2)It’s available for us to send engineers to guide install
3)Online technology consult
1.Professional Beer Equipment manufacture with 8 years experiences in China.
2.Dedicated team of consulting Services&Professional team of technical engineers
3.Complete quality control and management systems
4.Industry leading manufacturing facilities
5.3Years After-sales services for our goods.
6.Complete beer line to meet different capacities and all kinds of beer
7.Customize machine can be offered(voltage,material,dimension,heating source and so on)
8.With CE & ISO9001:2000 Certification
Micro beer brewing equipment has been sold around the world in the past few years in many countries. Due to the excellent quality and good reputation, we have opened the market in many countries,our beer brewing equipment have export to USA, Germany, Uzbekistan, Romania, Brazil, Ecuador, South Africa and other countries, and our customers also give us a high rating and recognition. If you need, you can go to local brewery to visit.
Sucessful Cases:
CocONTA ntac
Jinan International Trade Co.,Ltd
Candy Wang
Whatsapp:+8615562564562
Email:candy@brewerycn.com
FAQ:
. Q: Are you trading company or manufacturer?
A: We are a professional beer brewing equipment manufacturer in this field.
2. Q:How any years does your warranty ?
A: The main turnkey for 5 years, auxiliary ones for 1 year.
3. Q: Is possible to supply installation in our country ?
A: Yes, we could supply engineer to supply installation guidance and training.
4. Q: What kind of beer will can be make use your system?
A: With our electric heating mini brewery equipment can make different kinds beer,ale,lager ,IPA ,pilsen beer and so on.
5. Q: What utilities do I need for a brewery?
Typically water, electricity and drains are needed.
In general 2 and 3 phase electricity is needed and can be 110/220/380/400/415/440 at 50/60Hz.
The size of the water connection is determined by the size of the brewery but for most projects 5.000 liter of water per hour with a pressure of 3 bar is sufficient.
For your steam boiler a natural gas connection or a tank with light oil will be needed.
Because of the temperature, steel pipe drains are preferred in a brewery and sufficient drains are always handy.