Home > Products > Construction & Decoration > Other Construction Materials

hot dipped ganlvanized best price cuplock scaffolding system for sale 1hot dipped ganlvanized best price cuplock scaffolding system for sale 2
  • hot dipped ganlvanized best price cuplock scaffolding system for sale 1
  • hot dipped ganlvanized best price cuplock scaffolding system for sale 2

hot dipped ganlvanized best price cuplock scaffolding system for sale

Model:-
Brand:ADTO
Origin:Made In China
Category:Construction & Decoration / Other Construction Materials
Label:galvanized cuplock , cuplock system , best price cuplock
Price: US $150 / pc
Min. Order:30 pc
Inquire Now Add to Basket

Member Information

Detail

ADTO group Hunan

Free MemberHu Nan - China
Live Chat:Last Online:04 Jun, 2018

Product Description

best price cuplock scaffolding system manufacturer in China

 VXT9FEJ4CK023X(E_IQP1HD.png

 

]G]]QU}3WC4TR`FM2%4C(K.jpg

 

D{K1DB_)D2LZ]M(11$4FS[7.png

component:

*Standard(vertical)

*Ledger(horizontal)

*Intermediate transom

*Diagonal brace

*Spigot connector

*Base Screw

*U head screw

*Metal plank or catwalk

feature

1.Corrosion and abrasion resistance

2.Its sturdy construction leads to withstand high pressure

3.High tensile strength

4.Sturdy design with dimensional accuracy

 

SIZE

Standard

length(M)

weight(KG)

self finish

painted

hot galv.

L=0.50

2.42

2.5

2.57

L=1.00

4.84

4.98

5.13

L=1.30

6.54

6.74

6.93

L=1.50

7.25

7.47

7.69

L=1.80

8.96

9.22

9.49

L=2.00

9.67

9.96

10.25

L=2.30

11.37

11.71

12.05

L=2.50

12.08

12.44

12.81

L=3.00

14.5

14.93

15.37

 

ledger

length(M)

weight(KG)

self finish

painted

hot galv.

L=0.60

2.38

2.45

2.52

L=0.90

3.44

3.55

3.65

L=1.00

3.8

3.91

4.03

L=1.20

4.51

4.65

4.78

L=1.30

4.87

5.01

5.16

L=1.50

5.58

5.75

5.91

L=1.80

6.65

6.85

7.05

L=2.00

7.36

7.58

7.8

L=2.50

9.14

9.41

9.69

 

intermediate transom

length(M)

weight(KG)

self finish

painted

hot galv.

L=0.60

3.59

3.7

3.8

L=0.90

4.66

4.8

4.93

L=1.00

5.01

5.16

5.31

L=1.20

5.72

5.9

6.07

L=1.30

6.08

6.26

6.44

L=1.80

7.86

8.09

8.33

L=2.00

8.57

8.83

9.08

L=2.50

10.5

10.66

10.97

L=3.00

12.13

12.46

12.86

Name

Length

Weight (Kg)

Self Finish

Painted

Hot Dip Galv.

Diagonal Brace

L=0.60Mt

3.59

3.70

3.80

Diagonal Brace

L= 1.3Mt

5.22

5.37

5.53

Diagonal Brace

L= 1.8Mt

7.48

7.71

7.93

 

Name

Length

Weight (Kg)

Self Finish

Painted

Hot Dip Galv.

Spigot Connctor

L=0.25Mt

0.69

0.71

0.73

 

 

 

 

Company Information

Xiangjia Steel is  a leading manufacturer of BS1139 scaffolding tube, system scaffoldings and accessories, galvanized steel tube,Frames,steel props, metal planks and other related products.

 

• 7 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.  

factory

5UI`JOQ(O%8FF1D($2$5FR1.png

WIWI`B[18X0GPMCBWU3GZMS.png

trade show

GEL{%XGE)GSUS3L97UDRZ3K.png

CERTIFICATE

425TR{M64TT5II[(XE$[5D9.png 

FAQ

Our Service:
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:00am - 5:30pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question.

 

 

1. Q: What's your MOQ(minimum order quantity)?

 

    A: One full container.

 

2. Q: What's your packing methods?

 

    A: Packed into bundle, and rest in bulk.

 

3. Q: What's your payment terms?

 

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

 

4. Q: What's your delivery time?

 

    A: 10-20 days after received the advance payment or L/C.

 

5. Q: Are you manufacturer or trader?

 

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

 

6. Q: Where's your factory?

 

    A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

 

7. Q: Can we visit your factory?

 

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

8. Q: Can you supply other scaffolding materials?

 

    A: Yes. All related scaffolding materials.

 

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

 

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

 

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

 

        (4) steel coupler (preesed / drop forged coupler)

 

        (5) steel plank with hooks or without hooks

 

        (6) steel stair case

 

        (7) screw adjustable base jack

 

        (8) Adjustable props

 

 

Main Buying Procedures:
• Enquiry: contact us by email, phone call, fax, Instant tools (Trademanager, MSN, Skype) and let us know your enquiry.
• Discussion: specify the items you want, confirm specification.
• Quotation: Prices offered and accepted.
• Place order as per contract or discussion.
• Proforma invoice offered to double confirm the order for both sides record.
• Payment settled.
• Order completed under our arrangement.
• Goods shipped as per contracted term.
• Goods arrive at local port or warehouse, depending on contracted term.
• Support & re-ordering.

 

 

We also Supply:
BS1139 galvanized scaffolding pipe, Ringlock scaffolding system, Adjustable steel props, Adjustable screw jack,Frame system, Metal plank, Scaffolding coupler& accessories, cuplock scaffolding system etc.   

Contact Info.

Eric

ADTO Group

Changsha Xiangjia Metal Material Co.,ltd.  
Office add: Rm 1605-1609, Mingcheng International Bd., No.46 Renmin East Rd, Changsha, Hunan, China 
Factory add: No. 16, Baiyi Road, Da Qiu Zhuang County, Tianjin, China 

Email: eric(at)adtomall.com 
Skype: live:adtoeric

Tel:  +86-731-85713246

Fax: +86-731-88925505
Mobile: +86-15084911343


Product Image

hot dipped ganlvanized best price cuplock scaffolding system for sale 1
Img 1
hot dipped ganlvanized best price cuplock scaffolding system for sale 2
Img 2

Send Inquiry to this Member

ADTO group Hunan

mingcheng international building renmin east road

Phone:
86-731-88660572
Fax:
86
Contact:
eric (sales manager)
Mobile:
15084911343

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Other Construction Materials Made In China Products

,  

Other Construction Materials China Suppliers and China Manufacturers