Home > Products > Industrial Supplies > Construction Machine

inner Climbing Tower Crane QTG20 (3065) fro Sale 1inner Climbing Tower Crane QTG20 (3065) fro Sale 2
  • inner Climbing Tower Crane QTG20 (3065) fro Sale 1
  • inner Climbing Tower Crane QTG20 (3065) fro Sale 2

inner Climbing Tower Crane QTG20 (3065) fro Sale

Model:QTG20 (3065)
Brand:DAYOU
Origin:Made In China
Category:Industrial Supplies / Construction Machine
Label:tower crane , tower crane for sale , inner-climbing tower
Price: -
Min. Order:1 pc
Inquire Now Add to Basket

Member Information

Detail

Jinan Tony International Trade Co.,LTD

Free MemberShan Dong - China
Live Chat:Last Online:01 Jul, 2014

Product Description

 New inner climbing tower crane QTG20 (3065)
Max. Load: 2t 
Tip load: 0.65t 
Jib length: 30m 
Free standing height: 19.8m

 

New QTG20 inner climbing tower crane: Rated lifting moment

KN· M

200

Max lifting weight

t

2

Working radius

m

2.5-30

Hoisting height

Independence

m

25.6

Hoisting speed

Two magnification

m/min

26.4/6.3

Four magnification

 

Slewing speed

r/min

0.76/0.38

Trolleying speed

m/min

22.5

Jacking speed

 

Mini steady falling speed

< 7

Outside dimension of whole crane

Chassis

m

3.847× 3.847

The height of crane

Independence

35

Attachment

 

From boom end to slewing center

 

From tail of balance arm to slewing center

8.4

The whole weight

Structure weight

Independence

t

10.838

Attachment

 

Balanced weight

3.470

The total volume of electric motor

kw

15.6

Allowed working temperature

Degree

-20~+40

The index of power supply

60Hz

~380V± 10%

 
 

 

 Inner climbing tower crane QTGNP Series

We successfully developed this new kind of crane which is used inside buildings. It can greatly save your cost by saving mast sections.

Product Description

Inner Climbing Tower Crane has three attached frames, from down to up respectively are load bearing attached frame, antirotation attached frame and transition attached frame. The distance between two adjacent attached frames is nine to twelve meters, three attached frames all are on the girder Steel, and they connect with the girder Steel by bolts. The girder Steel is put on the concrete beam of core tube elevator hoistway, and they connect with each other by bolts to assure that connection of girder steel and building structure is reliable. All attached frames can be dismantled to assure the cycle use and function conversion. Load bearing attached frame is mainly to bear the vertical-down acting force generating in every kind of working condition. Antirotation attached frame is mainly to bear the torsional moment and bending moment generating in every kind of working condition, and serve as the climbing pathway in the process of climbing and at last it serves as antirotation attached frame. Tower crane only uses load bearing attached frame and antirotation attached frame to fix tower body in normal working condition, but before climbing we need to install the third attached frame to serve as transition attached frame, so as to assure the reliability of climbing track. Climbing height is the distance between load bearing attached frame and antirotation attached frame.

1\Fix two pieces of ready-made girder steel to concrete beam of building's core tube by sixteen bolts, then install strengthen attached frame on the girder steel and adjust the gap between guide pulley and tower body(generally two to five millimeters). Note: The armoured concrete beam of building must be designed by designing institute and up to the requirement of bearing capacity.

2\Fix the jib in the direction of vertical to climbing crossbeam and adjust the range of trolley to make the barycenter of tower crane pass jacking oil cylinder.

3\Put the claw hand of inner climbing jacking crossbeam on inner climbing pathway, raise the tower body up, and put claw hand of inner climbing base section on vertical position. Figure (1); Put the claw hand of inner climbing base section level, limiting tower body sliding down, draw back jacking oil cylinder. Figure (2); After jacking oil cylinder is drawn back, put the claw hand of inner climbing jacking beam level, and put the claw hand of inner climbing base section vertical. Figure (3); Repeat it again and again to make tower body rise as desired requirement. Figure (4). When tower crane rises to desired height, lay two load bearing support square beams under the channel steel of inner climbing base section, let them bear the weight of tower crane.

More details about these products, please contact me directly. I can provide you the detailed Configuration Sheet and other necessary technical info you need.


Payment Terms:TT/LC

Product Image

inner Climbing Tower Crane QTG20 (3065) fro Sale 1
Img 1
inner Climbing Tower Crane QTG20 (3065) fro Sale 2
Img 2

Send Inquiry to this Member

Jinan Tony International Trade Co.,LTD

Room104, Block 5,Area A3 Luxinmingzhu Building,Zhangqiu, Shandong, China

Phone:
86-0531-83217577
Fax:
86-0531-61322277
Contact:
Raina Wang (sales manager)
Mobile:
13515415872

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Construction Machine Made In China Products

,  

Construction Machine China Suppliers and China Manufacturers