Work Flow
Decoiler—leveling—punching holes—feeding---roll forming---cutting the panel—Run out table
Machine Components
1. Decoiler rack------------------------------------------1 set
2. Feeding and leveling device-----------------------1 set
3. Hydraulic punching device--------------------------1 set
4. Roll forming machine---------------------------------1 set
5. Cut to length system----------------------------------1 set
6. Computer control system----------------------------1 set
7. Run out table--------------------------------------------1 set
Main technical parameters
a. Feeding width: 450mm
b. Maximum roll thickness: 3.0-4.0mm
c. Working speed: 0-15m/min
d. Power: 22KW(Driven), 15 KW(Hydraulic station)
e. Forming steps:13
f. Dimension of the whole machine: 11500*2000*1600mm
The detailed information of the machine components
??Simple Decoiler
1.Maximum weight: 5T
2.I.D: 500-800mm
3.O.D: 1500-1800mm
4.Decoiler width: 400-600mm
Main Part
1.13 forming steps
2.Diameter of the shaft: 90mm
3.Material of the shaft: 40Cr,quenched and tempered
4.Forming mould: GCr15, Forging,quenching hardness HRC60-62, Process: roughing--finishing--heat treatment--bore grinding
5.Slider block is cast( thickness is 25mm)
6.Feeding and leveling device:
This device consist of plane guiding rollers( material is GCr15),
Leveling rollers (9 pieces)
7.Hydraulic device: material of the punching mould is Cr12
(quenched and tempered) quenching hardness is HRC58-60,2
2 pieces of punching mould can complete 9 holes
?
??Cutting to length system
1. Material of cutter: Cr12, quenched and tempered
2. Heat treatment hardness: HRC58-60
3. Tolerance: +/- 2 mm
??Control system
This system consists of PLC( Panasonic), Transducer, Touch Screen Control cabinet, Operation rack,etc.
(this price including the installation and testing service , just need the buyer pay for our engineer’s return air tickets , their labor service charge(100USD per day per person), and please arrange the daily trip (eating , living , travel expenses etc) for them when they are working for the buyer .
Payment: T/T, 40% as advance, 60% before shipment
Delivery: 75 days after received the down payment. The buyer must take the machine in 90days from the contract signed date, if not, it means the buyer abandons the business, and the seller will stop this business and confiscate the down payment for loss.
Quality warranty: one year after the machine installing and testing in your factory, and technical support for the whole life of the machine
After sale service: in warranty ,seller will provide repair service if the machine runs out because the machine quality problem not the operator and natural disaster and needs the buyer show us the demonstration
The seller won’t provide the repair service as following items:
because the natural disasters;
because the operator’s fault ;
because the buyer refit the machine by themselves ;
because move or transport the machine after installation
If buyer need to pay for the repair service laborage charge and theaccessory as above items.