Home > Products > Industrial Supplies > Tools > Electric Power Tools

portable Breakdown Analyzer for on-site testing of transformer oil 1portable Breakdown Analyzer for on-site testing of transformer oil 2
  • portable Breakdown Analyzer for on-site testing of transformer oil 1
  • portable Breakdown Analyzer for on-site testing of transformer oil 2

portable Breakdown Analyzer for on-site testing of transformer oil

Model:IIJ
Brand:TOP
Origin:Made In China
Category:Industrial Supplies / Tools / Electric Power Tools
Label:testing equipment , oil analyzer , measurement tool
Price: US $1 / pc
Min. Order:1 pc
Inquire Now Add to Basket

Member Information

Detail

Chongqing Top Oil Purifier Co., Limited

Free MemberChong Qin - China
Live Chat:Last Online:06 Aug, 2013

Product Description

The IJJ-II dielectric oil tester by TOP is a portable Breakdown Analyzer for on-site testing of transformer oil.
 
The dielectric strength of insulating oil can be tested in a simple, quick and fully automatic way, without the need to ship oil samples to a test laboratory.
 
The plant operator is in a position to decide ad hoc on the need for substitution of the transformer oil and to initiate respective measures.
 
Features :
1) Fully automatic, control by microcomputer, utilization of new I/O terminal.
2) Numbers of times of testing and idling time of stirring are set via digital setting.
3) Test results displayed and printed out automatically.
4) Strong capability of anti-interference.
5) High accuracy of testing and high capacity of anti-jamming.
6) Easy to operate, small size, light weight which operated in the open air very conveniently and convenient for maintenance
7) Can store 99 groups oil testing data which is convenient to reading and print. The testing data can keep 100 years under the condition of power off.
8) System time can go on running under power off.(the system time just for reference can not be the standard of timing)
 
Technology and parameter data
1. Power supply: AC220V 10%, 50 HZ
2. Voltage output: 60 KV, 80KV, 100KV
3. Capacity: 1.6KVA, 2.0KVA
4. Pressure increase rate : About 2 KVA/S
5. Pressure testing speed: 3%
6. Break down sensitivity : <2KV
7. Wave form distortion :≤3%
8. Time of break down: ≤10ms
9.  Operational environment: Temperature:0°C-40°C, Humidity: the most relative humidity85%
10. Storage environment : Temperature:-20°C-40°C, Humidity: the most relative humidity75%.
11. Operational height: <150m (can be specially designed if the height is over 1500m)
12. Test cell: Glass, volume 300 to 500 ml, with protective cover and stirrer.
13. Electrodes: Stainless steel spherical 36 mm diameter/hemispherical 25 mm radius,   2.5 mm gap as per IEC-156.
14. Nitial stand time of oil sample: 180 seconds
Intermediate stand time of oil sample: 60 seconds
String time of oil sample:  60 seconds
Number of consecutive test: 6
15. Weight for High voltage and control: Total about 50kg
 
Analyzers, Electrical Instruments, Electronic Measuring Instruments, Measuring Instruments, Measuring & Gauging Tools, Optical Instrument and Parts, Other Measuring Analysing Instruments, Testing Equipment
 
 

Payment Terms:T/T

Product Image

portable Breakdown Analyzer for on-site testing of transformer oil 1
Img 1
portable Breakdown Analyzer for on-site testing of transformer oil 2
Img 2

Send Inquiry to this Member

Chongqing Top Oil Purifier Co., Limited

No.11 Zhangping street, Jiulongpo District, Chongqing, China

Phone:
86-23-88901306
Fax:
86-23-88901306
Contact:
Abby (Manager)
Mobile:
13983391036
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Electric Power Tools Made In China Products

,  

Electric Power Tools China Suppliers and China Manufacturers