Home > Products > Transportation > Vehicles > Boats Ships

2700m3 TSHD 1
  • 2700m3 TSHD 1

2700m3 TSHD

Model:-
Brand:-
Origin:Made In China
Category:Transportation / Vehicles / Boats Ships
Label:trailing suction , hopper dredger , TSHD
Price: -
Min. Order:1 pc
Inquire Now Add to Basket

Member Information

Detail

Wuhan Pan-Asia Equipment Engineering CO.LTD

Free MemberHu Bei - China
Live Chat:Last Online:25 Mar, 2015

Product Description

2700m3 TSHD

Date of rebuilt: 2006

Class: CCS

Loa: 87.30m

Length: 81.00m

Load waterline: 84.58m

Breadth: 13.8m

Depth: 8.00m

Light draft: 4.77m

Draft: 6.50m

Gross tonnage: 2465t

Net tonnage: 1380t

Load displacement: 5199.16t

Light displacement: 2105.70t

Referenced load: 2770t

Navigation area: offshore

Deck: single

Transverse bulkhead: 7

Deck material: steel

Hull material: steel

Double bottom: Fr. 30#~120#

Anchor winch: 19.5kw, Hatlapa 

Main engine: RBV8M540, 2352KW, by DEUTE

Gear box: GWS60.80,  3.0417:1

Propeller: 4 blade, fixed type, made of bronze, diameter: 5400.00

Generator: 5 groups, 120kw, 136kw, 136kw, 64kw, 36.8kw

Discharge diameter: 650mm

Marine mud pump: 6500m3/h

Dredging depth: 30m

Oil consumption: 4.5~6ton/24hours

Auxiliary engine: 3 sets,/1500 r/min 136 KW 2set(new),120KW 1set

mud pump motorsubmersible pump 550 KW

mud pump diesel engine(Jinan Diesel Engine Factory) 900 KW / 1450 r/min

High pressure water jet (Jinan Diesel Engine Factory) 720 KW / 1500r/min

Water jet pressure, lift: 99  1900M3 / h

Bow side propeller, power: 500 KW

pump tank spare generator: 64 KW/1500r/min

emergency generator 36.8 KW/1500r/min

Mud hold 2665 M3  

dredging depth(under water) light vessel and ,30M

Self-balanced hopper door(2.1M) 6 on both left and right

Swell compensator: 250/280-1500

Drag head winch: 250KN  10m/ min

Dredging draft: 6.80 M

Middle drag winch: 320KN  10m/ min

Dredging navigation speed: 3kn

Main engine rotating speed when dredging: 260 r/min 

Loading time: about 45minutes a vessel

Unloading time: about 15 minutes

Fuel: 0# diesel

Working oil consumption: (the whole vessel) below 6 ton per day(open high pressure water jet)

Maintenance: 4.5ton per day

Remarks: all the dredging equipment and pumps are new and automatically controlled. It is with complete navigation track equipment, satellite radar, GPS. The dredging monitoring software is from Shanghai Jiaotong University. It is with low oil consumption, high mud concentration of underwater pump. New drag head: 8.6t(high pressure water jet pump: 10kg, high breaking power), stable machinery performance, high level automation.

It has been used in 300,000ton channel dredging in Zhanjiang, 100,000ton channel dredging of Shenzhen Dapengwan, Zhuhai Gaolandao channel, Shenzhen Dachanwan channel, Fangchenggang channel, Fuzhou Yuxi Dianchanggang and was highly recognized.

For more details.please feel free to contact me via e-mail or MSN. My e-mail address is Pan-AsiaShip-Cam act hotmail dot com.


Payment Terms:tt

Product Image

2700m3 TSHD 1
Img 1

Send Inquiry to this Member

Wuhan Pan-Asia Equipment Engineering CO.LTD

Room 1505, flat A, Midlink Plaza, No.31 Yunlin Street, Jiang'an District, Wuhan, Hubei, China

Phone:
86-27-85719780
Fax:
86-27-85553933
Contact:
Cam (trader)
Mobile:
15871440440

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Boats Ships Made In China Products

,  

Boats Ships China Suppliers and China Manufacturers