Model: | - |
---|---|
Brand: | - |
Origin: | - |
Category: | Industrial Supplies / Food, Beverage & Cereal Machine |
Label: | ss beer equipment , brewing equipment , micro beer equipment |
Price: |
¥55000
/ pc
|
Min. Order: | 1 pc |
Live Chat: | Last Online:27 Oct, 2015 |
1000L stainless steel commercial beer brewing equipment
DEGONG PROVIDE THE MICRO BEER BREWING EQUIPMENT 1000 L/DAY ON THE TURNKEY BASIS
Obtainable productivity of the mini brewery, including the natural loss of beer in technology process:
per day: 1000 l
per week: 6000 l
per year: 300 000 l
Products:
fresh beer (non-filtered beer)
filtered beer
pasteurized beer
Heating of the brew kettle and boiler:
electric heating — (standard option)
natural gas heating
steam heating
EQUIPMENT DESCRIPTION
BREWHOUSE
1. Grinder (mill) 1 piece
2. Malt lift machine 1 piece
3. brew kettle (mash tun) 1 piece
4. whirpool (hydrocyclone vessel) 1 piece
5. boiler (hot water vessel) 1 piece
6.Plate heat exchanger, operation platform 1 set
FERMENTATION UNIT
8. conical (unitank) tank 6 pieces
9. Bright beer tank(storage) tank 2 pieces
10. equipment for collection and storage of yeast(yeast adding tank) 1 piece
FILTRATION AND FILLING UNIT
11. diatomite filter 1 piece
12. semiautomatic device for rinsing, washing, disinfection of keg-barrels and filling beer into keg-barrels 1 set
COOLING SYSTEM
15. OPTIMA 1 – cooling system 1 set
CIP CLEANING SYSTEM
16. 50L Alkali tank 1 piece
17. 50L Sterilization tank 1 piece
18. Washing pump 3000l/h 1 piece
CONTROL SYSTEM
19. central control panel of brewhouse 1 piece
20. Control panel of fermentation and cooling system 1 piece
Production Flow
37 °C |
Mash mixing |
52 °C |
Mash heating |
64 °C |
Low sugar formation temperature |
64 °C |
Pumping a part of wort to a lauter tun |
73 °C |
High sugar formation temperature |
100 °C |
Mash boiling |
73 °C |
Lautering |
100 °C |
Wort boiling |
12 °C |
Wort cooling |
Packaging & Shipping
1) Package:inner with stretching membrane and PE paper, outer with frame steel, or customized
2) Payment terms: T/T, L/C, Moneygram.
3) If the total amount paid one-off, it can be lower than the quotation.
4) Trade terms: FOB Qingdao /CIF/CFR.
5) Offer validity: the offer will be valid in 30 days.
6) Shipment method: by sea or suitable for your requirement.
7) Stock up period: within 40 working days.
8) Conditions of payment: 30%, advance payment after signing the contract; 70%, after preparation of the equipment for shipment/3 days before shipment.
9) Warranty: 18 months for main machine, 12 months for auxiliary machine, all life service.
Company Information
Pictures
Our Services
The service includes:
Brewery layout planning
Electrical schematics
Plumbing schematics
Detailed manuals
On-site startup/training
Ongoing technical support
Spare Parts Warehouse
Warranty service: 18 months for main tanks and 6 months warranty for accessories.
Certifications
If you are interested in our equipment,please contact me.
fern@degonget.com
skype:1531633841@qq.com