Home > Products > Electronics & Electricity > Other Electrical & Electronic

Pt100 Three Phase Energy Meter ,Dual input Multifunction Power  1
  • Pt100 Three Phase Energy Meter ,Dual input Multifunction Power  1

Pt100 Three Phase Energy Meter ,Dual input Multifunction Power

Model:194J-9SY
Brand:Chaonaide
Origin:Made In China
Category:Electronics & Electricity / Other Electrical & Electronic
Label:Pt100 power meter , LCD power meter , Energy Meter
Price: US $60 / pc
Min. Order:1 pc
Inquire Now Add to Basket

Member Information

Detail

CHONGQING BLUE JAY ELECTRONIC CO., LIMITED

Free MemberChong Qin - China
Live Chat:Last Online:31 Jul, 2015

Product Description

Three Phase Multi-function Smart Power Meter, Panel Mounted Energy Meter,CE Approved, 96*96mm

 

The BJ-194Q delivers the visualization of parameters listed above by means of LCD type displays. In the main display area shows 4 power parameters, with other display area show the various parameters and state of meter on each page jump.

 

OTHER FEATURES

 

- Low-size (96 x 96 mm), panel-mounting meter.

- True R.M.S. measuring system.

- Instantaneous, maximum and minimum values of each measured parameter.

- Energy measurement (indication through a lighting led)

- With positive/negative energy measurement

- RS-485 or Ethernet (optional) type communication to a PC.

1. The BJ-194Q multi-function network power meter, once cabled and connected is seen to give a correct voltage and current reading, but shows negative values for active power (generation).

 

This is an error with the cabling for the current transformer secondary; the direction of the transformer current has to be respected as shown in the connection diagram. The current transformers have a two face primary; the current must pass from P1 to P2 giving the result in secondary (S1 and S2) of 5 amps.

 

The error stems from:

a). The current transformers have been incorrectly installed. As a result it gives the direction of the current as passing from P2 to P1; to resolve this problem, the current transformer does not have to be dismantled and installed again, but the transformer secondary (S1 and S2) just has to be inverted.

 

b). The connection of the current secondary in the current transformers have been incorrectly connected; to resolve this problem just connect the S1 transformer secondary to the S1 on the meter and the S2 on the current transformer to the S2 on the meter

 

2. The BJ-194Q, once cabled and connected, is seen to give an incoherent Power factor and Cos reading (-0.01 or similar).

 

This is again a current transformer and voltage phase connection error phase A, must correspond to the current transformer installed in phase A; phase B, must correspond to the current transformer installed in phase B; and phase C, must correspond to the current transformer installed in phase C.

 

This connection is clearly shown on the back of the analyzer.

 

3. The BJ-194Q is measuring in average voltage and is displaying the secondary voltage (for example 110 volts).

Ensure that the voltage Transformer ratio has been correctly set (see section on chapter7).

 

4. The BJ-194Q does not correctly display the current reading. It shows values varying between 0 to 5 amps of current.


Product Image

Pt100 Three Phase Energy Meter ,Dual input Multifunction Power  1
Img 1

Send Inquiry to this Member

CHONGQING BLUE JAY ELECTRONIC CO., LIMITED

Jiangbei District, Chongqing, Redstone Road 2# 17-3

Phone:
86-023-86850812
Fax:
86-023-86850812
Contact:
katrina (manager assistant)
Mobile:
86850812

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Other Electrical & Electronic Made In China Products

,  

Other Electrical & Electronic China Suppliers and China Manufacturers