Model: | HHT9403GFL |
---|---|
Brand: | Hongtai |
Origin: | Made In China |
Category: | Transportation / Vehicles / Special Transportation Equipment |
Label: | lift powder trailer , powder trailer , tanker trailer |
Price: |
US $35000
/ pc
|
Min. Order: | 1 pc |
Live Chat: | Last Online:11 Mar, 2014 |
Specification
Overall dimension: 11900*2500*4000
net volume:50m3
Total weight:40000kg
Pay load:31100kg
Output:gravitational discharge
Rate work pressure:0.2MPa
Material:aluminum alloy and Q345B
Chassis:
Axle: 3 piece of 12 or 13 TON BPW, FUWA or YONGLITAI
Front or rear suspension:-/2290
Rear Track:1840/1840/1840
Number of Leaf Springs(front/rear):-/10/10/10,-/8/8/8
Landing gear:Jost double speed manual operation or other
Kingpin:Jost 2" or 3.5"
Suspension:FUWA mechanical tri-axle suspension with 16*90 8-leaf springs
Pneumatic braking system:a system with emergency brake and parking brake ;one unit of WABCO RE 6relay value;four unit of T30/30spring brake chamber;one unit of 40L air tank;two unit of standard copper air-connector
Wheel rim:8.25R22.5 or other type on sale
Tyre:Triangle ,Ling Long ,Double Coin or other equivalent brand
Lift cyllider:HYVA,FA214-5-09030
Discharge system
Discharge:4" seamless steel tube at bottom of funnel and through the top of axle
Quadratic blow:Same direction as discharge tube,1"diameter,with ball valve and check valve
Discharge valve:10"stainless steel gate valve disc valve
Pipeline cleaning equipment:at the beginning of discharge tube
Tank cleaning equipment:11/2" rubber flexible hose
Other:
Ladder:1 or 2 at front or rear or both ,bolted or welded
Tool box:one box with selectable dimensions
Lights and wire:one unit of 24V 7pin with LED lights
Painting:Sand blasting processing on rust cleaning
One coat of anticorrosive
Two coats of finish urethane paint
Colour as customer required
Spare part:
Alloy manhole cover
Flange for manhole rack unloading valve
Oil and gas recovery joint
Built-in respiration valve
Respiration valve
Oil monitor
Price Terms: | FOB Tianjin |
---|---|
Payment Terms: | TT/LC |
Packing: | Wax before shipment by container or bulk cargo ship or Ro-Ro |
Lead Time: | 30 to 60 days after confirmation |
Standards Certificate: | CCC/ISO/SGS/CIQ/BV |